BESS Technical Downloads

BESS Engineering Resources & Download Center

Access technical resources for commercial and industrial battery energy storage systems, including product datasheets, installation manuals, system architecture documents, BMS / PCS / EMS communication references, transport files and project engineering information.

BESS Technical Documentation for C&I Energy Storage Projects

Technical documentation should match the exact BESS configuration selected for the project. Battery energy, PCS power, voltage level, cooling method, communication interface and local compliance requirements can change the applicable datasheet, manual and engineering file set.

Use this page as the central document hub for C&I BESS product information, system integration references and project support files. All listed product datasheets are available as direct PDF downloads; project-specific engineering documents can be requested separately.

Commercial & Industrial BESS Product Datasheets

Product datasheets typically include rated power, usable energy, battery chemistry, system voltage, PCS parameters, enclosure rating, cooling method, dimensions, communication and operating conditions.

Mini C&I BESS
PDF AVAILABLE

30kVA / 40–60kWh All-in-One BESS

30kVA three-phase all-in-one C&I BESS with 40.96–61.44kWh LiFePO4 capacity for peak shaving, solar energy storage and commercial backup power.

Technical Datasheet · Direct PDF Download

Download Datasheet (PDF) → View Product →
All-in-One C&I BESS
PDF AVAILABLE

80kVA / 128–209kWh BESS

High-voltage C&I energy storage system specifications for peak shaving, solar integration and backup power.

Technical Datasheet · Direct PDF Download

Download Datasheet (PDF) → View Product →
Liquid-Cooled C&I BESS
PDF AVAILABLE

125kW / 261kWh Liquid-Cooled BESS

Liquid-cooled industrial battery storage specifications covering battery, PCS, BMS, EMS and thermal-management interfaces.

Technical Datasheet · Direct PDF Download

Download Datasheet (PDF) → View Product →
Liquid-Cooled C&I BESS
PDF AVAILABLE

125kW / 232.9kWh Liquid-Cooled BESS

Technical parameters for commercial and industrial liquid-cooled battery energy storage applications.

Technical Datasheet · Direct PDF Download

Download Datasheet (PDF) → View Product →
High-Capacity C&I BESS
PDF AVAILABLE

80kVA / 418kWh Liquid-Cooled BESS

High-capacity C&I BESS specifications for industrial loads, solar storage and microgrid applications.

Technical Datasheet · Direct PDF Download

Download Datasheet (PDF) → View Product →
Containerized BESS
PDF AVAILABLE

1–5MWh Container Energy Storage System

Containerized battery storage specifications for MWh-scale industrial, microgrid and large commercial projects.

Technical Datasheet · Direct PDF Download

Download Datasheet (PDF) → View Product →

BESS Installation & Commissioning Manuals

Installation and commissioning documentation should be used only for the exact system model and project configuration. Typical manuals cover lifting, foundations, electrical connections, grounding, auxiliary power, communication wiring, startup checks and commissioning procedures.

Installation Manual
Mechanical placement, clearances, cabling, grounding and site requirements.
Commissioning Guide
Pre-energization checks, startup sequence, alarms and functional verification.
Operation & Maintenance
Routine inspection, thermal management, fault checks and preventive maintenance.
Site Installation Checklist
Civil, electrical, communication and safety items before commissioning.

BESS System Architecture, SLD & Engineering Documents

Engineering documents help EPCs, integrators and electrical engineers understand how the battery, PCS, transformer, switchgear, meter, EMS and site loads are connected.

Document Typical Content Used By
Typical SLDBattery → DC protection → PCS → AC protection → transformer → PCC / gridEPC / Electrical Engineer
System ArchitectureSolar PV, grid, PCS, BESS, distribution, site loads and control layersIntegrator / Project Manager
Electrical InterfaceVoltage, current, breaker, transformer, grounding and auxiliary requirementsElectrical Engineer
Foundation / LayoutCabinet spacing, service clearance, cable entry and civil requirementsEPC / Civil Engineer

BMS, PCS & EMS Communication Documents

Communication documents define the data and command interfaces used for battery protection, power control, monitoring and site-level energy scheduling.

CAN Bus
Battery status, SOC, SOH, limits, alarms and control data.
RS485 / Modbus RTU
Common serial communication for BMS, PCS, meters and controllers.
Modbus TCP / Ethernet
Site-level monitoring, EMS integration and equipment data exchange.
Register / Protocol Map
Addresses, status words, alarms, commands and operating parameters.

BESS Safety, Transport & Compliance Documents

Available compliance documents depend on the exact battery, system model and destination market. Always confirm the certificate scope, model number and revision before using a document for a project submission.

UN38.3
Lithium battery transport test documentation.
SDS / MSDS
Safety data for battery transport and handling.
IEC / UL Documents
Product or system certification files where applicable to the selected model.
CE / Grid Compliance
Regional conformity and grid-related documentation where applicable.

Need a Specific BESS Technical Document?

For model-specific PDFs, SLDs, communication maps, packing data, transport documents or certification files, send the exact BESS model, project country, system power / energy and required document type.

Request Technical Documents →
Next Step in Your BESS Project

From Documents to System Integration

After reviewing a datasheet, continue to the engineering resource that matches your project stage. Each destination below is used once to keep the internal-link structure clear.

BESS Technical Download FAQ

Are all BESS datasheets interchangeable?

No. Datasheets must match the exact system model, battery configuration, PCS rating, voltage level and revision.

Can you provide a project-specific single-line diagram?

A typical SLD can be used for early discussion, while a project-specific SLD should be prepared after site voltage, transformer, PCS and grid-connection requirements are confirmed.

Can I request BMS / PCS / EMS communication documents?

Yes. Communication files should be matched to the selected equipment configuration and software or firmware revision.

How do I verify whether a certificate applies to my BESS model?

Check the certificate scope, manufacturer, model number, standard, report or certificate number and revision against the exact system being quoted.

Need Help Applying the BESS Documents?

Send your site voltage, load profile, target kW / kWh, PCS requirements and communication needs for technical review.